| TIID | 43870657 |
| Organisation Name | National Hydroelectric Power Corporation Limited |
| Tender Brief | Corrigendum : Diversion Tunnel Construction Adit Including Dt And Coffer Dams, Mandiyal Nalla Dt, Coffer Dykes And Platform, Lcat, Roads And Associated Works, Right Bank Spiral Tunnel, Access Tunnels, Dam Works With Associated Hm Works For Sawalkot Hep, Ut Of Jk |
| Last Date For Submission | 7th Sep, 2026 |
| Opening Date | 09 Sep, 2026 |
| Document Cost | 40 K |
| EMD | 10 CR |
| Estimated Cost | 5129.03 CR |
| City | Ramban |
| State | Jammu and Kashmir |
Shivpuri, Madhya Pradesh, India
Corrigendum : Grouting And Leakage Channelisation Work At Various Locations Of Power House At Manikheda Hep
hapoli, Arunachal Pradesh, India
Corrigendum : Lot-1- Construction Of Diversion Tunnels, Cofferdams, Main Dam Including Hm Works Of Diversion Tunnels, Approach Roads And Bridges Of Kamala H.e. Project (1720mw), Kamle District, Arunachal Pradesh
Faridabad, Haryana, India
Corrigendum : Construction Of Civil Works Of Barrage And Stilling Basin, U/s Plastic Cutoff Trench, Power Intake Structures, Tunnel, Outfall Structure, Associated Hm Works Including Adit Plug, Etc And Associated Works Of Link-3 Project In Himachal Pradesh
Dharchula, Uttarakhand, India
Corrigendum : Construction Of Trench Weir, Power Intake Including River Diversion Arrangements, Desi...
-9
days left
Get your quote now and avail the chance to enter first 5 lucky customer with extra 20% discount
© Tender Infotech. All Rights Reserved. Designed by Tender Infotech